Please see below for the latest drawings for the redevelopment that is to take place over summer on the lower floor of our school (music room and hall area). The plans take into consideration that almost every existing wall is a structural wall and cannot be touched, modified or knocked down!
Please refer to my earlier blog post (see below) regarding the downloadable document with the finer details but essentially the music room will be more than doubled, a new outside learning/teaching area will be created with two access points (music room or multi-function room), a new multi-function room, new portable staging, improved lighting and sound and new air con with a reverse heating option. Where the two practice rooms are indicated on the above plan is where the current music room is to give you an idea of the improved teaching space. The area marked “music room” is currently the toilet and storage area.
It is all very exciting and we hope to have it go to tender within the next week.
For a downloadable version of the plans above and more slides please click the following link – Performing Arts Redevelopment Plans. Please appreciate that the computer generated drawings are indicative only.